The Kings Holding Service, Inc. (KSH) project in the Village of Montgomery has been scaled back after the village board passed a local law removing the senior overlay corridor along Route 211.
Ross Winglovitz, Principal Engineer with Engineering and Surveying Properties, P.C , said the 80-unit senior housing units were removed from the project. The 200,000 and 90,000 square-foot warehouses were replaced with two two-story office buildings, each with a footprint of 2,500 square feet and 28 parking spaces.
Winglovitz said the project still needs to undergo the SEQRA process and several other studies.
“There are a lot of studies to come,” Winglovitz said.